Eight high-profile stadiums set to open around the world in 2026

This year will see high-profile stadiums for football, rugby, American football and ice hockey complete in countries including USA, Turkey, Saudi Arabia, New Zealand and Kenya. Here are eight of the most impactful.


New Highmark Stadium , USA, by Populous

New Highmark Stadium, USA, by Populous

Nearing completion in Buffalo, New York, the new Highmark Stadium will become the home of NFL team Buffalo Bills.

One of several high-profile stadiums designed by US studio Populous completing this year, the 62,000-seat venue was informed by the architecture of Buffalo and was designed to have an “intimate yet intimidating” atmosphere.

“[It] merges their projection of strength with modern materials and a building form that is set to create an intimate and intimidating football-first environment,” said Populous senior principal Jonathan Mallie.

Find out more about New Highmark Stadium here ›


Miami Freedom Park, Manica

Inter Miami Freedom Park Stadium, USA, Manica Architecture 

Also in the US, Miami Freedom Park will open as the home of Major League Soccer team Inter Miami, which is co-owned by English footballer David Beckham, later this year.

Designed by US studio Manica Architecture, the 25,000-seat stadium will be located near Miami Airport to the west of the city. It will sit within a 58-acre parkland site designed by architecture studio Arquitectonica containing hotels, restaurants, soccer fields and athletic courts.


New Ankara Stadium, by BKA, Turkey

New Ankara Stadium, by Bahadır Kul Architects, Turkey

Set to be the home of the Turkey national football team and host games during Euro 2032, New Ankara Stadium in the country’s capital is also set to complete later this year.

Designed by Turkish studio Bahadır Kul Architects, the 58,000-seat stadium will be topped by a steel roof that was informed by the “form of the soccer ball”.


Talanta Sports Stadium, Kenya

Talanta Sports Stadium, Kenya, by Major Victor King’e

Currently being built by Chinese contractor China Road and Bridge Corporation, the 60,000-seat Talanta Sports Stadium in Nairobi will be the largest venue in the country when it is completed.

Officially named the Raila Odinga International Stadium after Kenya’s former prime minister, the covered stadium will be almost entirely wrapped in a white steel mesh. Supported on the decorative facade will be eight giant shields that match the motif from the country’s flag.

The stadium is being built ahead of the 2027 Africa Cup of Nations, which will be hosted by Kenya, Uganda and Tanzania, and will host the tournament’s final.


Te Kaha’ – One New Zealand Stadium, New Zealand, by Populous and Warren and Mahoney

Nearing completion in Christchurch, New Zealand, Te Kaha’ – One New Zealand Stadium, will be a multi-use venue for rugby union, rugby league and football, as well as music events.

Being built as part of the Christchurch Central Recovery Plan, the 30,000-seat stadium will replace the Lancaster Park stadium, which was damaged in the 2011 earthquake.


Aramco Stadium by Populous

Aramco Stadium, Saudi Arabia, by Foster + Partners and Populous

As Saudi Arabia prepares to host the World Cup in 2034, the first of a slew of new stadiums for the tournament is set to complete this year in Khobar, on the country’s eastern coast.

With a concept by UK studio Foster + Partners and now being completed by Populous, the design of the 47,000-seat Aramco Stadium was informed by whirlpools.

“The stadium’s architecture celebrates the sea’s dynamic nature and its profound influence on the local community,” said a description in the official World Cup bid document. “Its whirlpool-shaped design mimics overlapping sails and draws on graceful, natural wave motifs, to blend seamlessly with the coastal landscape.”

Find out more about Aramco Stadium here ›


Etihad Stadium, UK, by Populous

Another project by Populous that is set to complete this year is the expansion to football club Manchester City’s stadium in England.

Populous’s redevelopment of the Etihad Stadium will increase the seating capacity of the North Stand by more than 5,000 by extending it upwards. Attached to the stand will be a building containing a 400-bed hotel, museum and club shop.

Find out more about Etihad Stadium here ›


Santa Giulia arena in Milan by David Chipperfield

Milano Santagiulia Ice Hockey Arena, Italy, by David Chipperfield

Manchester City stadium expansion

Set to host the ice hockey matches at the 2026 Winter Olympics, the Milano Santagiulia Ice Hockey Arena was designed by David Chipperfield Architects. The 14,000-seat arena was designed to reference traditional amphitheatres.

“The elliptical form of the building is inspired by the archetype of the amphitheatre, being reinterpreted with modern tectonics and materials,” said David Chipperfield Architects.

The arena is set to open at the beginning of February when the 2026 Winter Olympics begins, however, last week International Ice Hockey Federation president Luc Tardif revealed that the venue will not be fully complete when the tournament begins.

Can Saudi Arabia still complete The LINE?

IN THE south west corner of the Arabian desert, an enormous trench has been formed. It may look like it was carved out by an alien presence but it is in fact evidence that one of the most ambitious construction projects in history is steaming ahead.

The 200-metre wide trench runs from the Hejaz mountains across to the Gulf of Aqaba. As if that wasn’t enough, a small portion of it contains the start of what will be the biggest set of foundations ever built. Once that concrete has set, the first vertical structures will begin to emerge.

This incredible hive of activity is in fact the construction site of The LINE, Saudi Arabia’s wildly ambitious megacity in the desert. To put it another way, the thing everybody said would or could never be built is actually being built.

Above: Satellite imagery showing construction of The LINE Image: Google.

Or is it? Because for every sign of progress, rumours swirl of scalebacks, insurmountable budget blowouts and mass lay offs. There are even rumours swirling that the whole thing has been cancelled. But what we actually know for sure is much more limited.

2026 will be make or break for The LINE. This is where deadlines need to be met and progress will be measured in height, not hype. Regardless of what you think of this mind boggling project, there’s a country with its future invested in it and a leader whose reputation is staked on it.

So, the trillion dollar question: will it ever be built?

Let’s start with the basics. The LINE is Saudi Arabia’s plan for a 170-kilometre linear city, rising to a consistent height of 500-metres. When it’s complete, it’ll form the capital city of NEOM, a vast new region in the country’s northwest, dreamed up by the country’s de facto ruler, Crown Prince Mohammed bin Salman. NEOM, in turn, forms a key pillar of Vision 2030, a countrywide plan to transition the Saudi economy away from oil dependency by 2030.

Above: An early render of The Line. Image: NEOM.

How is it being built? The initial challenge for any projector of this scale is geology. The LINE crosses wildly varying terrain: hard mountain rock, soft open desert, and salty coastal plains. To build anything across such varied land, you first need a uniform, stable footing.

That’s where foundations come in. The LINE will rest on a subterranean structure known as a piled raft foundation. The “piles” are sunk deep into the earth, along the Line’s footprint. These cylinders of reinforced concrete bypass soft, unstable strata of earth and rest upon the hard bedrock below. The flat concrete “raft” lays on top of these piles and creates a flat, uniform platform to build on.

To pull this off, an automated factory is churning out 32-metre long rebar cages, used to mould and reinforce each pile. Meanwhile, drilling rigs use GPS to precisely bore the holes these rebar cages will be dropped into. A biodegradable liquid is pumped into the holes to stop them from collapsing before concrete can be poured in.

But it’s not just soft earth engineers have to grapple with. Being so close to the sea, this stretch also needs protecting from the highly saline ground water. Left untreated this could rust the steel cages and over time corrode the concrete piles.

To solve this, the world’s largest de-watering system was created. 500 wells were drilled along a stretch of The LINE, each equipped with a water pump at its base. Water is pumped out at a rate of 90,000-cubic metres per hour towards a settlement pond where the quality of the liquid is checked. From there, the water is filtered and pumped out to sea in a series of discharge pipes.

Work on the foundations for phase one is nearly complete which means the project is about to enter its next milestone: going vertical.

On a typical skyscraper, that means building the core. If you’ve ever walked past a construction site, you’ll have seen these go up, they’re not very attractive, but they’re critical to how a skyscraper works. It’s essentially the backbone of the building, and it’s formed by pouring concrete into a mould that gets pushed up by hydraulic jacks.

Above: A typical skyscraper core under construction.

But with The LINE, there’s a twist. Because it’s a city, not a building, it won’t have a 170-kilometre long core that everything sits inside. Instead, it will feature thousands of cores. These will be developed features in their own right but crucially, they will also support a series of decks.

Imagine taking Manhattan’s grid, folding it up and stacking it vertically. These decks are the city’s avenues and the cores are the streets linking each one. This is where the city will come to life. On these decks you’ll find schools, housing, transport, everything you need to make a city function.

Phase one will see 4.8-million tonnes of steel outrigger beams hoisted up to support five decks running through each. Usually on skyscrapers, the steel frame and cladding start to be added before the core is finished. That’s potentially why 2026 could be a huge year for The LINE, because it’s the first stage we can expect to see fast progress.

Above: Steelwork outrigger beams are expected to be installed on The Line’s cores

Read more